田乃媛, 吴晓东. 全连铸生产调度系统仿真模型的建立[J]. 工程科学学报, 1996, 18(3): 226-230. DOI: 10.13374/j.issn1001-053x.1996.03.006
引用本文: 田乃媛, 吴晓东. 全连铸生产调度系统仿真模型的建立[J]. 工程科学学报, 1996, 18(3): 226-230. DOI: 10.13374/j.issn1001-053x.1996.03.006
Tian Naiyuan, Wu Xiaodong. Buildup of Simulating Model for Full Continuous Casting Production Scheduling System[J]. Chinese Journal of Engineering, 1996, 18(3): 226-230. DOI: 10.13374/j.issn1001-053x.1996.03.006
Citation: Tian Naiyuan, Wu Xiaodong. Buildup of Simulating Model for Full Continuous Casting Production Scheduling System[J]. Chinese Journal of Engineering, 1996, 18(3): 226-230. DOI: 10.13374/j.issn1001-053x.1996.03.006

全连铸生产调度系统仿真模型的建立

Buildup of Simulating Model for Full Continuous Casting Production Scheduling System

  • 摘要: 对具有离散事件系统特征的全连铸车间生产调度系统,通过建立其仿真模型进行试验,实现了借助计算机仿真全连铸生产过程,编制了相应调度程序软件,给出多种优化调度方案图,可供实际生产调度参考使用。

     

    Abstract: The scheduling system in continuous casting workshop is characteristic of discrete event. Some experiments are made on the simulating model. Programming the scheduling software and stimulating the process of full continuous casting are achieved by computer. The practical production with availably optimum scheme diagrams is provided for reference.

     

/

返回文章
返回