数据中心微电网多目标容量优化配置中的STPFR运行策略

An Operating Strategy for Data Center Microgrids Based on Time-Weighted Computing-Task Scheduling and Resource-Foresighted Energy-Storage Control

  • 摘要: 针对数据中心微电网(Data Center Microgrid,DCMG)容量优化配置中的运行策略开展研究,提出融合时间纵横赋权任务调度、资源前瞻储能调控和柔性充放电系数的STPFR策略。首先,将调度周期按时间窗口和供能阶段进行纵横划分,依据风光资源富足程度与分时电价设置窗口优先级,并结合任务时序约束完成算力任务排布。其次,利用前瞻时间窗口评估未来风光富余量,协调当前电网充电与后续绿电存储。再次,构建放电意愿系数和储能状态平衡系数,根据电价与荷电状态调节储能充放电行为。将所提策略嵌入NSGA-Ⅱ求解以经济成本和碳排放为目标的DCMG多目标容量优化配置模型。算例结果表明,在相同容量配置、任务集和电价条件下,与任务按到达时间直接执行相比,所提任务调度机制使购电成本和碳排放分别降低63.43%和29.65%;与仅依据当前净功率和固定高低电价阈值的储能控制相比,中电价时段风光经储能吸收量提高127.43%,系统净运行成本降低38.36%;柔性系数调节使低电价时段放电量降低83.16%,高电价时段放电量提高110.13%。结果表明,所提策略能够改善算力负荷、风光资源、储能与电网的时序协同。

     

    Abstract: An operating strategy integrating time-window weighted computing-task scheduling and resource-foresighted energy-storage control is proposed to improve the temporal coordination among computing workloads, wind and photovoltaic generation, energy storage, and the utility grid in a data center microgrid (DCMG). The strategy focuses on two key links: the temporal arrangement of computing tasks and the flexible charging and discharging control of the energy-storage system. For computing-task scheduling, conventional methods generally select either time windows in which renewable generation can fully supply the computing load or time windows with the lowest electricity price. However, they often neglect windows in which the available wind and photovoltaic power cannot completely satisfy the task demand but can still reduce grid electricity consumption. To address this issue, the economic break-even condition between renewable–grid coordinated supply and grid-only supply at the minimum electricity price is derived. According to the remaining renewable-power ratio and the time-of-use electricity-price level, the candidate time windows are classified, and a three-stage scheduling mechanism is established, including renewable-only supply, renewable–grid coordinated supply, and grid-only supply. In the coordinated-supply stage, a weighted score combining renewable-resource availability and electricity-price information is used to evaluate candidate windows. By adjusting the two weights, the scheduling preference can be shifted between renewable-energy utilization and electricity-cost reduction. Task-arrival time, allowable delay, and deadline constraints are then combined with the time-window priority to determine the final execution time of each computing task. For energy-storage operation, a flexible control strategy is developed by combining a discharge willingness coefficient, a storage-state balancing coefficient, and a forward-looking renewable-surplus window. The discharge willingness coefficient is jointly determined by the real-time electricity price and the state of charge (SOC), and is used to regulate the allowable discharge power during load-deficit periods. A high electricity price and a high SOC increase the discharge willingness, whereas a low electricity price or a low SOC reduces premature energy release. The storage-state balancing coefficient is used to correct charging and discharging decisions when the battery approaches its upper or lower operating limits. It prevents unnecessary discharge when the battery is fully charged but the current electricity price is not sufficiently high, and restricts excessive grid charging when the battery is nearly depleted but the price is not sufficiently low. In addition, a finite forward-looking window is introduced to estimate the future wind and photovoltaic surplus. When the expected surplus is large, current grid charging is restricted to reserve storage space for subsequent renewable-energy absorption; when the expected surplus is insufficient, low-price grid charging is allowed to maintain adequate stored energy for future load shortages or high-price periods. The proposed operating strategy is embedded into a multi-objective DCMG capacity optimization model. Wind-power capacity, photovoltaic capacity, and rated energy-storage capacity are selected as decision variables, while economic cost and carbon emissions are taken as optimization objectives. NSGA-Ⅱ is used to obtain Pareto-optimal capacity configurations. For each candidate solution, a complete operating simulation is performed, including task scheduling, renewable-power allocation, storage charging and discharging, and grid electricity purchasing and selling. A case study is conducted using 12 consecutive days of wind and photovoltaic data, computing-task data, and time-of-use electricity prices with a 5-min resolution. Compared with direct task execution according to task-arrival time, the proposed scheduling mechanism reduces electricity purchasing cost and carbon emissions by 63.43% and 29.65%, respectively. Compared with a storage controller based only on current net power and fixed high- and low-price thresholds, the proposed strategy increases the amount of renewable electricity absorbed by storage during intermediate-price periods by 127.43% and reduces the net operating cost by 38.36%. Meanwhile, discharged energy during low-price periods decreases by 83.16%, while that during high-price periods increases by 110.13%. These results demonstrate that the proposed strategy improves task–renewable matching, expands the effective utilization of wind and photovoltaic resources, and enhances the cross-period regulation capability of energy storage, thereby providing an effective operating basis for economical and low-carbon DCMG capacity optimization.

     

/

返回文章
返回