方祖烈. 金川二矿区不良岩层巷道地压活动规律及控制方法的研究[J]. 工程科学学报, 1984, 6(1): 1-20. DOI: 10.13374/j.issn1001-053x.1984.01.017
引用本文: 方祖烈. 金川二矿区不良岩层巷道地压活动规律及控制方法的研究[J]. 工程科学学报, 1984, 6(1): 1-20. DOI: 10.13374/j.issn1001-053x.1984.01.017
Fang Zulie. Study on the ground pressure and control method for openings in soft and broken rocks in Jin Chuon Mine No. 2[J]. Chinese Journal of Engineering, 1984, 6(1): 1-20. DOI: 10.13374/j.issn1001-053x.1984.01.017
Citation: Fang Zulie. Study on the ground pressure and control method for openings in soft and broken rocks in Jin Chuon Mine No. 2[J]. Chinese Journal of Engineering, 1984, 6(1): 1-20. DOI: 10.13374/j.issn1001-053x.1984.01.017

金川二矿区不良岩层巷道地压活动规律及控制方法的研究

Study on the ground pressure and control method for openings in soft and broken rocks in Jin Chuon Mine No. 2

  • 摘要: 本文从理论和实践的结合上阐述了不良岩层巷道维护问题。其要点是:①找出了1978年以前金川在不良岩层中采用多种支护型式都难以维护的根本原因是:把流变体围岩稳定问题视为单纯的传统支护结构问题;②确定了不良岩层的基本属性为易发展为松散体的流变体,从理论上阐明了不良岩层巷道必须分次支护的理由;③查明了不良岩层巷道地压类型,以流变体变形地压为主;④总结了地压活动基本规律,分析了在围岩纵深12米范围内,最终出现的二个压密区、一个松驰区、一个松动区,压密区实际上是承载环,在围岩稳定过程中起着关键作用,从理论上解释了金川不良岩层巷道围岩稳定过程;⑤采用了信息化设计——现场监控设计法;⑥提出了金川不良岩层巷道支护原理和设计方法,即根据岩层不同属性,不同地压来源,从分析地压活动规律入手,运用信息化设计法,使支护特性和施工工艺过程不断适应围岩变形的活动状态,以达到抑制围岩变形、维护巷道稳定的目的。

     

    Abstract: This paper elucidates the theory and proclice of opening mainteance insoft and broken rocks. Its main peints are as follows.
    (1) The radical Cause of failure of viarous type of supporting structure in soft and broken rocks in Jin Chuon Mine before 1978 has been found to be that the stabilizing problem of rheological rocks around openings was simply regarded as a structure problem of conventional supporting.
    (2) The soft and broken rocks in Jin Chuon Mine is a kind of rheological materials which may readily become loose material. So it is necessary to use secondary supports for the openings in such rocks.
    (3) The ground prossure around the openings in soft and broken rocks in Jin chuon Mine is recognized as a deformation pressure of rheological amaterial.
    (4) The basic regularity of ground pressure in Jin Chuon Mine is determined there are two compressed and compacted regions,one slack region, and one broken region around the openings in 12 meters deep. The compressed and compacted regions are bearing circles and play a critical part in stabilizing the openings around.
    (5) An information design method, field supervision and control method is used in Jin Chuon Mine.
    (6) The supporting principles and design methods of openings in softs and broken rocks in Jin Choun Mine are put forward. It is important to us-information design method to make support property and construction tech-nic to fit deformation condition of rocks around the opening.lt is also important to restrain rock deformation and slabilite the apening through anal ysis of regularity of ground pressure in accordance with different rock properties and ground perssure type.

     

/

返回文章
返回