李铨, 鹿守理, 卢于逑. 轧钢企业订货、排产及调整的集成化[J]. 工程科学学报, 1993, 15(6): 576-579. DOI: 10.13374/j.issn1001-053x.1993.06.007
引用本文: 李铨, 鹿守理, 卢于逑. 轧钢企业订货、排产及调整的集成化[J]. 工程科学学报, 1993, 15(6): 576-579. DOI: 10.13374/j.issn1001-053x.1993.06.007
Li Quan, Lu Shouli, Lu Yuqiu. The Integration of Order, Arranging Uaily Plan and Adiusting for a Steel Rolling Mill[J]. Chinese Journal of Engineering, 1993, 15(6): 576-579. DOI: 10.13374/j.issn1001-053x.1993.06.007
Citation: Li Quan, Lu Shouli, Lu Yuqiu. The Integration of Order, Arranging Uaily Plan and Adiusting for a Steel Rolling Mill[J]. Chinese Journal of Engineering, 1993, 15(6): 576-579. DOI: 10.13374/j.issn1001-053x.1993.06.007

轧钢企业订货、排产及调整的集成化

The Integration of Order, Arranging Uaily Plan and Adiusting for a Steel Rolling Mill

  • 摘要: 对轧钢企业订货.排产及调整进行了集成化研究。使用多级计划与调整模型实现了订货、排产及调整的并发控制与动态调整.并用专家系统方法完成了上述工作。与传统办法相比,克服了各阶段之间分离的缺点。

     

    Abstract: The integration of order, arranging daily plan and adjusting can be completed for the simultaneously control and dynamic adjustment of order, arranging and adjusting by using the model of multi-plan and adjustment integrated, and the above works can also be completed by expert system. Compared to the traditional methods, this method overcomes the disadvantages of separations among different stages.

     

/