刘茂林, 田乃媛, 徐安军. 高炉-转炉区段物流过程解析[J]. 工程科学学报, 2000, 22(1): 8-11. DOI: 10.13374/j.issn1001-053x.2000.01.027
引用本文: 刘茂林, 田乃媛, 徐安军. 高炉-转炉区段物流过程解析[J]. 工程科学学报, 2000, 22(1): 8-11. DOI: 10.13374/j.issn1001-053x.2000.01.027
LIU Maolin, TIAN Naiyuan, XU Anjun. Analysis of Mass Flow Process in the Zone of Blast Furnace and Converter[J]. Chinese Journal of Engineering, 2000, 22(1): 8-11. DOI: 10.13374/j.issn1001-053x.2000.01.027
Citation: LIU Maolin, TIAN Naiyuan, XU Anjun. Analysis of Mass Flow Process in the Zone of Blast Furnace and Converter[J]. Chinese Journal of Engineering, 2000, 22(1): 8-11. DOI: 10.13374/j.issn1001-053x.2000.01.027

高炉-转炉区段物流过程解析

Analysis of Mass Flow Process in the Zone of Blast Furnace and Converter

  • 摘要: 通过对高炉一转炉区段物流过程的、提出该区段经历3次大的发展,形成2种典型布局.简要论述了各工序功能;着重阐述了该区段流程布局的变化及工序间衔接、匹配的重要性;总结出流程布局发展的必然性和本质特点。

     

    Abstract: Mass flow process has been analysed in the zone of Blast Furnace and Converter. Three stages and two kinds of layout have been put forward about the development of it. The working procedure functions have been discussed. The changes of the zone layout and the importance of the joining and matching have been elaborated. The necessity and nature on the zone development have been summarized.

     

/