谢铁军, 程涛, 刘任平. 提前/拖延调度问题最优解的结构[J]. 工程科学学报, 2000, 22(3): 284-288. DOI: 10.13374/j.issn1001-053x.2000.03.026
引用本文: 谢铁军, 程涛, 刘任平. 提前/拖延调度问题最优解的结构[J]. 工程科学学报, 2000, 22(3): 284-288. DOI: 10.13374/j.issn1001-053x.2000.03.026
XIE Tiejun, CHENG Tao, LIU Renping. Structure of Optimal Solution for E/T Scheduling[J]. Chinese Journal of Engineering, 2000, 22(3): 284-288. DOI: 10.13374/j.issn1001-053x.2000.03.026
Citation: XIE Tiejun, CHENG Tao, LIU Renping. Structure of Optimal Solution for E/T Scheduling[J]. Chinese Journal of Engineering, 2000, 22(3): 284-288. DOI: 10.13374/j.issn1001-053x.2000.03.026

提前/拖延调度问题最优解的结构

Structure of Optimal Solution for E/T Scheduling

  • 摘要: 讨论了带有4项惩罚指标的提前/拖延调度问题,目的是确定最优公共交货期和确定最优排序.给出了最优公共交货期的确定方法,提出了联合惩罚因子的概念,并讨论了最优解的结构.

     

    Abstract: A kind of E/T scheduling problem with four penalty factor is discussed in order to determine the optimal sequences and optimal common due date. A method about how to determine common due date is presented, the concept of combinative penalty factor is proposed, and the structure of optimal solution is discussed.

     

/