CHEN Chaowu, DONG Shaohua, DING Wenying. Optimization of multi-stage production planning in ERW pipe manufacturing[J]. Chinese Journal of Engineering, 2006, 28(7): 691-695. DOI: 10.13374/j.issn1001-053x.2006.07.018
Citation: CHEN Chaowu, DONG Shaohua, DING Wenying. Optimization of multi-stage production planning in ERW pipe manufacturing[J]. Chinese Journal of Engineering, 2006, 28(7): 691-695. DOI: 10.13374/j.issn1001-053x.2006.07.018

ERW钢管多阶段生产计划的编制及优化

Optimization of multi-stage production planning in ERW pipe manufacturing

  • 摘要: 生产计划是企业生产管理的起点和依据.本文分析了高频电阻焊钢管的生产流程和生产计划的特点,提出了钢管企业多阶段生产计划提前/拖期惩罚模型,并用实数编码遗传算法进行了求解及优化,得到生产计划的较优解.仿真结果表明,模型和算法是可行和高效的.求解方法在钢管实际生产计划编制中得到了良好的应用.

     

    Abstract: Multi-stage production planning plays an important role in improving the production rate and energy saving in modern manufacturing industry. Based on the analysis of production flow and planning of an electric resistance welding (ERW) manufacturing enterprise, this paper proposes an advanced/delayed punishment mathematical model of multistage production planning. A local optimal solution for it is obtained by the real number-coding genetic algorithm. Simulation results indicate that the model and algorithm are feasible and efficacious. The presented solution has well applied to practical ERW production planning.

     

/