Ding Wenying, Wu Qingyi. Unified Production Plan on Direct Hot Charge Rolling[J]. Chinese Journal of Engineering, 1994, 16(5): 431-434,439. DOI: 10.13374/j.issn1001-053x.1994.05.006
Citation:
Ding Wenying, Wu Qingyi. Unified Production Plan on Direct Hot Charge Rolling[J]. Chinese Journal of Engineering, 1994, 16(5): 431-434,439. DOI: 10.13374/j.issn1001-053x.1994.05.006
Ding Wenying, Wu Qingyi. Unified Production Plan on Direct Hot Charge Rolling[J]. Chinese Journal of Engineering, 1994, 16(5): 431-434,439. DOI: 10.13374/j.issn1001-053x.1994.05.006
Citation:
Ding Wenying, Wu Qingyi. Unified Production Plan on Direct Hot Charge Rolling[J]. Chinese Journal of Engineering, 1994, 16(5): 431-434,439. DOI: 10.13374/j.issn1001-053x.1994.05.006
Unified Production Plan on Direct Hot Charge Rolling
The key point is put at planning system of the direct hot charge rolling (DHCR)in iron and steel production which is the higher production mode connecting steel making,continous casting and hot rolling. This paper discusses the way to realize the planning system and puts out a relatively detailed draft.