Hot Delivery and Hot Charging Based on Production Logistics Simulation System of Reheating Furnaces
-
Graphical Abstract
-
Abstract
The design of production logistics simulation system of reheating furnaces is introduced and the analyse of simulation results. Some characters and rules of the production planning and reheating furnaces manufacture during hot delivery and hot charging are put forward. This is used to assist Production, provide reference to drawing up hot delivery and hot charging planning and integrative management.
-
-